Categories
Travel

Extensive Maintenance Work on the Heritage Course at London Golf Club

Our Greenkeeping team has applied over 325 tonnes of sand to enhance the Heritage Course’s playability.

Maintenance Activities Overview

The work included hollow coring, scarifying, aeration, topdressing, and rolling on the greens, with 90 tonnes of sand applied. The greens have already had their first cut and will continue to be refined over the coming weeks.

Tees and Approaches

Deep scarification, aeration, and topdressing were performed on tees and approaches, with over 130 tonnes of sand applied in total.

Fairways and Drainage Improvements

Targeted topdressing of wet areas on the fairways involved 105 tonnes of sand, and over 1,200 metres of new drainage was installed across holes 8, 10, and 16. Additionally, the long rough on both courses has been cut back in preparation for the cooler months ahead.

This text was assisted by AI. Report a problem.